Monday, December 10, 2007

A room with a view? Or at least we think so. 12/10/2007

A beautiful sunny day, so I stuck my camera in my pocket when I left for a little spin. Stopping by the property is always a good destination. Although we are still waiting on the steel, some progress has been made. We hope to see more rapid changes soon. I got to climb up on the roof of the garage/workout space. Not too easy (or smart) with bike shoes on, but I couldn't resist. Considering the view is pretty good from here, I can only imagine what it will be from the third floor. Here is what I saw today:

The view from the top of the garage.

The detailing of the garage roof, which will eventually be a green roof.

The retaining wall.

Changes from this view are not too significant.

Saturday, December 1, 2007

Still waiting for the steel! 11/21/2007

Although we are still waiting for the steel, progress was being made. It was starting to look like something was being built. The bike garage and work out area got framed in and the retaining wall was ready to be poured. The footings were in and there was a lot of action on the property! It is fun to see something happening.

The ADU (accessory dwelling unit).
sweet!
And the retaining wall...
Love to see progress.

Tuesday, November 13, 2007

What's the hold up? 11/13/2007

Today I met on the property with David and Corey, the builder and architect. The steel is the hold up, but there are other things getting done as we hurry up and wait. Ah, the joy of building a house. Check out what is new...

The retaining wall footings about to be poured.

getting ready to frame the ADU


Dave Rush directing traffic & a pile of certified lumber.

Tuesday, October 23, 2007

At a snails pace... Tuesday, October 23, 2007

Biked by again today. It's become a weekly habit. I guess it isn't called trespassing when you are crawling over a fence that is meant to keep you out if you own the property, right??? I saw our neighbor from across the street again today, and as luck would have it, it was his 80th birthday!!! Happy Birthday Mr. Henkel!
Although it isn't awe inspiring, there was at least changes since my last bike by. Check it out...


Crawling over the orange fence had a new twist... a great big ditch to fall in.


The bike garage/workout facility has received a new surface. Gravel in, dirt out.


I guess the property line is getting ready for the retaining wall. Looks a lot different all dug up.

Tuesday, October 16, 2007

Another week gone by. 10/15/2007.

I did a "bike by" on the way to my massage. Ran into my neighbor across the street, Mr. Henkel. He questioned the 'slow progress'. Oh, isn't building fun??? In a short 10 months from now, we will be moving in.


The BIG hole.

Footings w/o wood support.

Plywood is gone. Cement has been poured.

Tuesday, October 9, 2007

October 9, 2007: Meeting with inspector

We were at the property for a meeting, so why not take some pictures and show you that there is cement poured. I guess we are making subtle progress.

The bike garage/work out area.

Footings are poured.

Lots of plywood.

Tim and our architect/friend Corey. Also a new father! Congrats Corey!!!

Tuesday, September 18, 2007

Progress.

I stopped by the lot today to check out the progress. From a distance, it doesn't look like much has happened, but taking a closer look, I saw the beginnings of our new foundation and basement. It is progress. I couldn't get too close, b/c it is all gated and locked up.
From the chain-link fence it doesn't look much different.
A closer look into the big hole shows the progress.
Looks about ready to pour.
Our future bike garage and work out space.

Tuesday, September 11, 2007

The ground has been broken...

Sometime when we were in Thailand, ground was broken. There is a big hole in the ground and has been for some time. Not sure what is next. But here is what it looked like before Thailand....


And now...