The retaining wall half destroyed.
It was injured (chipped) during steel construction, so is being re-poured.
It was injured (chipped) during steel construction, so is being re-poured.
The stomper, getting the ground compacted and settled.
I asked how high my ceilings were on the second floor. 8 feet is the answer.
View west from the third floor.
Mt. Hood should be visible from our bedroom.
Scott & Corey, the masterminds behind this, making sure it is getting built right.
I am down below freezing while Corey is taking pics, balancing on a beam.
I asked how high my ceilings were on the second floor. 8 feet is the answer.
View west from the third floor.
Mt. Hood should be visible from our bedroom.
Scott & Corey, the masterminds behind this, making sure it is getting built right.
I am down below freezing while Corey is taking pics, balancing on a beam.